BASIC DESIGN FINALIZED

After 6 months of hard work with excellent engineers from RoyalHaskoningDHV, KCI,Marin, Keppel verolme and van Hattum en Blankenvoort, we have finalized the Monobase GBF design for the Borselle Kavel 5 Demonstrator location. Waterdepth 38 m, turbine size 6-8 MW. The result is a low cost concrete structure with simple details like the J-tube-, sliding- and ballast systems.

The deliverables include:
– Study Report
– Basis of Design
– Structural analysis report
– Construction drawings Concrete Foot and Base
– Construction drawings Steel Leg and appurtenances
– Transport and Installation Drawings
– Risk Register

Please contact Jan Groot for more information jgr@monobasewind.com